Our projects

16 Whitfield Street

Global Holdings Management Group
-
Commercial Office (Refurbishment)
Services
Project Management & Employers Agent
Area
42,000 sqft
Procurement route
Single Stage Design & Build
RIBA stages
3 - 6

Redevelopment and expansion of a former British Transport Police office building to create prime CAT-A office space and affordable workspace, alongside amenities such as cycle storage. The project includes the construction of an additional floor and roof, new terraces and loggias across all floors plus façade replacement to both Whitfield Street and Tottenham Court Road elevations. Works are being carried out whilst an existing tenant Marks & Spencer remain fully operational across 3 floors at Tottenham Court Road side of the building. The project is being delivered to achieve BREEAM Excellent, NABERS 5* and WiredScore certification.

Barge Crescent South Bank

Global Holdings Management Group
-
Commercial Office (Refurbishment)
Services
Project Management & Employers Agent
Area
34,000 sqft
Procurement route
Single Stage Design & Build
RIBA stages
4-6

Project Description: Ground up redevelopment of an existing office building to create exceptional Cat-A office space with views over the Thames. The project included the demolition of the existing building back to slab and comprised new RC cores, structural frame, glulam structure to 4th and roof levels and a highly intricate façade with terraces at every level. Works were carried out on a logistically challenging site within close proximity to neighbouring properties. The project is being delivered to achieve BREEAM Excellent and NABERS 5* certification.

Arca Building

Oval Real Estate
-
Commercial Office (Refurbishment)
Services
Project Management & Employers Agent
Area
58,000 sqft
Procurement route
Two Stage Design & Build
RIBA stages
4 - 6

Project Description: Refurbishment of an existing office building within Birminhghams Central business District to create Grade A office accommodation across 10 floors. The project included the creation of a new amenity roof terrace, BCO compliant end of trip cycle facilities, replacement incoming utility supplies and a comprehensive refurbishment to both Cat-A and Cat-A+ across all landlord areas and vacant floors. The project achieved BREEAM Excellent, Wired Score Platinum and EPC A certification.

High Leigh 2FE Primary School and Nursery

Hertfordshire County Council
-
Education (Mainstream)
Services
Project Management & Employers Agent
Area
Procurement route
Two Stage Design & Build
RIBA stages
2 - 6

Project Description: Construction of a new 2 form of entry primary school within the emerging High Leigh Garden Village housing development. The project included relocating the existing Westfield Community School from their existing school that was well past its serviceable life. The school has been delivered within a live housing development site and required close coordination with the house-builders and master developer.

Journeys Academy

Hertfordshire County Council
-
Education (SEN)
Services
Project Management & Employers Agent
Area
Procurement route
Two Stage Design & Build
RIBA stages
3 – 6

Project Description: Construction of a new Communication and Autism School on green belt land to provide much needed additional Special Education places to meet the increased needs of such provision in Hertfordshire. The project includes the demolition of existing buildings on the site and the construction of the new school facilities to achieve compliance to the Department for Education school specification to achieve Net Zero Carbon In Operation.

Satellite of Amwell View

Hertfordshire County Council
-
Education (SEN)
Services
Project Management & Employers Agent
Area
Procurement route
Two Stage Design & Build
RIBA stages
1 – 6

Construction of a new Severe Learning Difficulties School on to provide much needed additional Special Education places to meet the increased needs of such provision in Hertfordshire. The project includes the construction of the new school facilities to achieve compliance to the Department for Education school specification to achieve Net Zero Carbon In Operation.

Gilston Villages

Hertfordshire County Council
-
Education (Mainstream)
Services
Programme Management
Area
Procurement route
TBC
RIBA stages
0 -2

Odyssey Projects are providing strategic construction programme management advisory services to Hertfordshire County Council in relation to delivery of education infrastructure at the emerging Gilston Park Estate development. The role encompasses Section 106 advisory services, production of a suite of bespoke school infrastructure servicing specifications,  programme and phasing advice and cost modelling. The development provides for up to 20FE of education for both primary and secondary provision across 7 villages of the 10,000 unit housing development.

6 Upper Grosvenor Street

Symphony Technology Group
-
Commercial Office (Refurbishment)
Services
Project Management & Employers Agent
Area
7,300 sqft
Procurement route
Two Stage Design & Build
RIBA stages
2 - 6

Project Description: Refurbishment of an existing Grade 2 listed office building to deliver super high specification office accommodation within the heart of Mayfair for and owner-occupier client. Works include extension of the lift shaft to service all floors, full MEP reservicing and a comprehensive internal refurbishment to Cat-B sensitive to the listed character of the property.

18 Upper Brook Street

Global Holdings Management Group
-
Commercial Office (Refurbishment)
Services
Project Management
Area
12,000 sqft
Procurement route
TBC
RIBA stages
2 - 6

Refurbishment of an existing Grade 2 listed office building to deliver best in class office accommodation to Cat-A within the heart of Mayfair. Works include MEP reservicing and internal refurbishment sensitive to the listed character of the property.

Avanti Grange Secondary School A120 Pedestrian Footbridge

Hertfordshire County Council
-
Education (Mainstream)
Services
Project Management & Employers Agent
Area
Procurement route
Two Stage Design & Build
RIBA stages
3 - 6

Construction of a pedestrian footbridge to link the school to its detached playing fields via a new pedestrian footbridge spanning the A120. The project includes the completion of design, execution of a S278 agreement and securing associated licenses to facilitate the closure of the highway for the installation of the bridge.